Extend your brand profile by curating daily news.

Ares Strategic Mining Opens First U.S. Fluorspar Processing Plant in Delta, Utah

By Advos•
Ares Strategic Mining's new fluorspar processing plant in Delta, Utah, marks a significant step toward rebuilding domestic supply of a critical mineral for steel and aluminum production.
Ares Strategic Mining Opens First U.S. Fluorspar Processing Plant in Delta, Utah

Ares Strategic Mining Inc. will host a ribbon-cutting ceremony on Friday, October 9, 2026, at 11:00 a.m. to officially open its new Lumps Plant in Delta, Utah. The facility processes raw fluorspar from the company's Lost Sheep Mine into metallurgical-grade fluorspar, known as metspar, marking the return of domestic fluorspar processing to the United States.

The event will bring together federal and state officials, strategic partners, industry leaders, and local stakeholders. Confirmed attendees include U.S. Representative Mike Kennedy, Carson Brown from the Office of U.S. Senator John Curtis, Utah State Senator David P. Hinkins, Emy Lesofski of the Utah Office of Energy Development, Dana Dean of the Utah Division of Oil, Gas and Mining, and Peter Godart, President and CEO of Found Industries. Ares is also coordinating attendance from representatives of the U.S. Department of Defense, U.S. Department of Energy, and Defense Logistics Agency.

"We have reached the moment when years of permitting, mine development, engineering, construction and financing have become a working U.S. mine-to-plant operation," said James Walker, President and CEO of Ares Strategic Mining. "Ore is being mined, trucked to our facility and run through the plant. Friday gives us the opportunity to recognize the team, shareholders, public-sector partners and local community who helped turn that plan into physical infrastructure. For Ares, this is the beginning of an entirely new chapter."

The Delta Lumps Plant is designed to convert run-of-mine fluorspar into metallurgical-grade product for industrial customers. Metspar is used principally in steel and aluminum production, where fluorspar acts as an important fluxing material. The plant's opening is a significant step toward rebuilding a domestic supply capability for a mineral that has long been strategically important to U.S. manufacturing. Ares is developing the supply chain from the ground up: mining ore at Lost Sheep, transporting it to Delta, processing it through company-built infrastructure, and preparing finished product for commercial markets. The company has previously announced a Memorandum of Understanding with global commodities trader Cremer Erzkontor Inc. for distribution of its metspar product across North America.

The ceremony will also recognize the State of Utah's support. During the 2025 General Session of the Utah State Legislature, legislation broadened the legal definition of a "throughput infrastructure project" to include infrastructure required for extracting and processing critical minerals. Ares subsequently received an $11 million state-supported loan through the Utah Community Impact Board to advance its Utah operations.

"The support we have received in Utah has allowed Ares to move from plans and engineering drawings to mine development, processing infrastructure and physical production," Walker said.

The Lumps Plant is the first major processing component of Ares' broader Utah strategy. The company is also advancing construction of its complementary Acidspar Flotation Plant, intended to produce higher-purity acid-grade fluorspar for chemical, technology, energy, and strategic-material applications. With mining underway and the Lumps Plant entering live-material operations, the ribbon cutting provides a formal public marker of Ares' transition into an operating mine-and-processing business. Ares expects to provide a further update following the ceremony.

For more information, see the original release at www.newmediawire.com.

Advos

Advos

@advos