ESGold Corp. has begun critical final spiral concentration tests at its Montauban Gold-Silver Project in Quebec, signaling a significant step toward initiating production later this year. The tests focus on high-grade railbed material, aiming to develop a concentration method that captures over 50% of contained gold and silver while representing less than 0.3% of total material mass.
The innovative testing approach could dramatically transform the project's production strategy. If successful, the process would enable direct on-site bullion production, substantially reducing cyanide usage and potentially accelerating cash flow. This method represents a potential breakthrough in more sustainable mining practices, addressing environmental concerns while maintaining production efficiency.
The company expects to receive final laboratory results within the next month, concurrent with ongoing plant commissioning at the Montauban site. Located 80 kilometers west of Quebec City, the Montauban property is positioned as a model for responsible mining practices, combining near-term production capabilities with broader exploration potential.
These concentration tests could have significant implications for the mining industry, demonstrating a more environmentally conscious approach to gold and silver extraction. By potentially minimizing chemical processing and improving material efficiency, ESGold may offer a template for future sustainable mining operations.



