ESGold Corp. (CSE: ESAU) (OTCQB: ESAUF) has commenced its 2026 surface diamond drilling program at the Montauban Project, located approximately 120 kilometres west of Québec City, Québec. The program is designed to drill about 5,000 metres across 29 proposed holes, with the primary goal of validating previously identified mineralization in the historic Montauban mine area, testing continuity between historical drill holes and mineralized panels, and investigating potential extensions into insufficiently tested areas.
According to the company, the new drilling, geological, and analytical data will contribute to its evolving three-dimensional geological model and help determine what additional work may be required to support a current mineral resource estimate under National Instrument 43-101 (NI 43-101). This is a critical step for ESGold as it advances the Montauban project, which is under construction with production anticipated in 2026.
The company has cautioned that historical estimates referenced in previous technical reports should not be treated as current mineral resources or reserves. This distinction is vital for investors, as the new drilling aims to provide reliable, up-to-date data that could form the basis for a compliant resource estimate.
ESGold Corp. is described as a fully permitted, fully funded, pre-production mining company advancing a scalable clean mining model across North and South America. The Montauban Gold-Silver Project is its flagship asset, and the company’s dual-track strategy focuses on generating cash flow today while pursuing discovery for future growth.
The initiation of this drill program marks a significant milestone for ESGold, as it seeks to de-risk the Montauban project and potentially enhance its economic viability. By targeting areas of known mineralization and testing extensions, the company aims to expand the resource base and improve confidence in the project’s geology.
For the mining industry, this drilling campaign underscores the importance of resource validation for advancing projects toward production. For investors, the outcome of this program could have direct implications for ESGold’s valuation and its ability to meet its production timeline.
The full press release can be viewed at https://ibn.fm/rQLw7. For the latest news and updates relating to ESAUF, visit the company’s newsroom at https://ibn.fm/ESAUF.


